CII WAREX – Warehouse Redesign

Project Summary

USD 2 Billion Telecom infra company with 100,000 towers engaged CII to rethink on distribution strategy. The objective was to fulfill seasonal demand and ensure Inventory accuracy

Project Scope

  • Site location: Choosing warehouse location to reach clients on time
  • Facility design:
    • Maximize Warehouse throughput
    • Optimize space utilization
    • Build-in operational flexibility thus delivering 99% fill rate during peak season
  • Inventory Accuracy

Achievements

  • Picking efficiency scaled up from 85% to 98%
  • Productivity improvement from 22 Man hours / Cbm to 12.5 man-hours / Cbm
  • Outperformed metrics – 63% on-time shipping
  • Inventory accuracy improved to 99.8% from 95%
  • Significant in space utilization