CII WAREX – Warehouse Redesign
10
Sep
Project Summary
USD 2 Billion Telecom infra company with 100,000 towers engaged CII to rethink on distribution strategy. The objective was to fulfill seasonal demand and ensure Inventory accuracy
Project Scope
- Site location: Choosing warehouse location to reach clients on time
- Facility design:
- Maximize Warehouse throughput
- Optimize space utilization
- Build-in operational flexibility thus delivering 99% fill rate during peak season
- Inventory Accuracy
Achievements
- Picking efficiency scaled up from 85% to 98%
- Productivity improvement from 22 Man hours / Cbm to 12.5 man-hours / Cbm
- Outperformed metrics – 63% on-time shipping
- Inventory accuracy improved to 99.8% from 95%
- Significant in space utilization